Tag Archives: First Railway line

Central Railway DC-AC conversion between CST to Thane complete

Central Railway has completed the on the conversion from 1500 Volt DC to 25000 Volt AC traction system over Chhatrapati Shivaji Terminus Mumbai (CSTM) to Mumbra (inclusive) on slow corridor and CST to Thane (exclusive) on fast corridor. Suresh Prabhakar